The hup! Extension Process: How Your Room Gets Built
Price first, design second, planning checked third, then a written programme. Here is every stage of a CWG hup! build, what happens at each one, and what you get.
- An honest outline price before you pay for drawings
- Planning position checked before anything is ordered
- A written scope and build programme
- Building Control inspects every stage
- The same CWG team on site from start to finish
- A walk-round with Craig at handover
STEP BY STEP
The 7 Stages of a CWG hup! Build
- Send a few photos or give us a call. WhatsApp Craig a few photos of the space (07962 219965) or call 0118 995 2549. You get a straight answer on what is possible, and roughly what it costs, before anyone visits.
- Free design visit. Craig visits, measures up and talks through what you want the room for: dining, a family room, a bedroom, an office. At the visit you get an honest outline price, so you know whether it works for your budget before anyone spends money on drawings.
- Design it properly. We draw your options and change them until they are right: size, roof style, doors, roof lights, heating and electrics. A hup! extension can have a tiled, flat or glazed roof, and we will tell you plainly which suits the way you will use the room.
- Planning position checked. Many single-storey extensions fall under Permitted Development, but not all: some homes, especially on newer estates or in conservation areas, have had those rights removed. We check your address before anything is ordered. If you need planning permission we prepare and submit the application. Councils aim to decide householder applications within 8 weeks.
- Fixed price, written scope and programme. Once the design and planning position are settled you get one fixed price in writing, a written scope that says what is and is not included, and a build programme. Payments are staged, and your quote shows what is due and when.
- The build. The hup! steel base goes in on concrete pads or ground screws instead of deep trench foundations. The insulated factory-made walls and the roof go up next: on a recent job the shell was up about 10 days after we started on site. Then windows and doors, electrics by a qualified electrician, plastering and making good. Building Control inspects each stage. Before loud or dusty work we tell you, and we partition off and clean up as we go.
- Handover. Craig walks round the finished room with you and puts right anything that is not right. You get your paperwork together: the hup! warranty, the Building Control completion certificate and the electrician’s certificate, plus our own workmanship guarantee in writing.
LIVING THROUGH IT
What It Is Like Living Through the Build
Most people stay at home while we build. hup! means less wet work and less time on site than a traditional extension, and we plan the noisy and dusty jobs so you know when they are coming.
“We expected a lot of disruption and building work, bricks, dust everywhere. And that was quite minimal for the amount of work that was done.”
CWG hup! extension customer, Wokingham
“They partitioned off the office space, reduced the noise. Any form of loud drilling they made us aware of… So there was absolutely minimal disruption.”
Kremer Signs, office build by CWG
STRAIGHT ANSWERS
What Can Change the Programme
We give you a written programme, not a guaranteed finish date, because a few things are outside anyone’s control:
- Planning decisions: the council sets the timetable for any application.
- Building Control inspections: each stage is booked in and inspected before the next one starts.
- Weather: groundworks and roofing need a dry spell.
- Made-to-order parts: the hup! system, windows and doors are made for your build.
If anything moves, we tell you straight away and update the programme.
YOUR QUESTIONS
hup! Build Questions
It depends on the size and finish, and whether planning permission is needed. On a recent job the shell was up about 10 days after we started on site, then the inside is finished: electrics, plastering and making good. Your written programme sets out each stage for your build.
Many single-storey extensions fall under Permitted Development, but some homes have had those rights removed, and conservation areas have extra rules. We check your address before anything is ordered and handle any application for you.
Most people do. We tell you before loud or dusty work, partition off where we can and clean up as we go.
We do. Building Control inspects each stage of the build and you get the completion certificate at handover.
No. We only build single-storey extensions, and we do them properly.
We plaster and make good. Decorating after that can be added to your quote, so ask at the design visit.
Start With an Honest Outline Price